In October this year, we successfully carried out a pilot project in Brandenburg together with the Nussli Group.
Thanks to the use of LIFTBOT, a considerable increase in efficiency of 45% was achieved, while the new TRBS 2121-1 was always complied with. The reduced physical strain was visible to all scaffolders at the end of the week.
We would like to thank the NUSSLI Group for the excellent cooperation and look forward to a successful future together.