Data analytics example
Total Operating Time
1.5 hours
Cumulative Transported Load
2,497 lbs
Total Amount of trips
20 times
Operational height
36 ft
Performance of load summary per hour
Data analytics example
Improvement
€312
The average cost of one man-hour: €52
Man-hour saved
23%
without LIFTBOT (Crane)
5 scaffold builders
with LIFTBOT
4 scaffold builders
Overview
Case study with
Brock Group
Project info
40” Demolition project in 1 day
Location
ExxonMobil Baytown Refinery in Texas
ExxonMobil Baytown saved 23% man-hours
Feedback
"There was nothing better than getting off a 10-hour shift and not feeling tired."
Arnulfo Cantu
Scaffold builder, Brock Group