Data analytics example

Total Operating Time

1.5 hours

Cumulative Transported Load

2,497 lbs

Total Amount of trips

20 times

Operational height

36 ft

Performance of load summary per hour

Data analytics example

Improvement

€312

The average cost of one man-hour: €52

Man-hour saved

23%

without LIFTBOT (Crane)

5 scaffold builders

with LIFTBOT

4 scaffold builders

Overview

Case study with

Brock Group

Project info

40” Demolition project in 1 day 

Location

ExxonMobil Baytown Refinery in Texas

ExxonMobil Baytown saved 23% man-hours

05_contact.png

Feedback

"There was nothing better than getting off a 10-hour shift and not feeling tired."

Arnulfo Cantu

Scaffold builder, Brock Group